COMPLETED WORKS

Fishing area infrastructure development

The fishing area infrastructure includesthe sewage pump station completed (the sewage pump station of type NS DN 4000 H 6000 fitted with WILO pumps. NS capacity is 15 m3/hour); purification facilities of rainwater sewage with oil removers with a capacity 6 liters/second(planned);exterior lighting networks (completed); pedestrian paths (completed); belvedere with a brazier (completed); secure car parking for 86 cars(completed); security checkpoint building completed (a two-storey building with a building area 89,6 m2, total structural volume 316 m3, with connection to the utility networks and fire alarm); panel outer fencing (completed), reinforced concrete staircases connecting pedestrian paths(completed); drainage gutters (completed); rainwater sewage wells (completed), coastal fortification and vertical planning (completed). Floating fishing platform assembled and installed. Bio toilets, garbage cans and benches have been purchased.

Guest area infrastructure development

The guest area infrastructure includes: exterior lightning networks and rainwater sewage networks (completed) and purification facilities for these networks with oil removers with a capacity 6 liters/second (planned); open-air secure car park for 233 cars (completed), fire water tanks (two metallic tanks installed with a water storage capacity 75 m3 for fire safety). Road signs are in place to regulate car traffic in the car parking area.

 

 

Beach infrastructure development

The beach infrastructure includes: security checkpoint building with entrance gate (a two-storey building with a building area 89,6 m2, with connection to the utility networks and fire alarm); fire water tanks with a capacity 75 m3; three sewage pump stations (sewage pump stations NS DN 4000 H 6000 capacity NS 15m3/hour; type NS DN 1500 H 4800 with a capacity 7m3/hour; type NS DN 1500 H 4000 with a capacity 2 m3/hour); fecal sewage networks, rainwater sewage networks, exterior lighting networks; floating modular platform (modular pontoons peerПМ.00.000 ИС. load-carrying capacity of each pontoon is 500kg).

 

The beach features facilities such as the children’s playground with a swing (completed), dressing halls (completed), sites for bio toilets installation(completed), children’s sand yard (planned), children’s entertainment attraction “slides” (planned), turn around area (completed), big belvedere with a brazier (completed), tennis court (completed), pedestrian paths (completed), a temporary post OSVOD (society of life saving society on water)(completed), waste collection sites (planned), outer fencing (completed), vertical planning and coastal fortification (completed), reinforced concrete staircases (completed). Tree planting and shrub planting (completed), flower beds arranged.

 

Infrastructure development

Installed networks:

Water supply В1: diameter 63 mm -55m, diameter 32mm- 15m, diameter 50 mm – 24m,

Fecal sewage line: diameter 100 mm -5m, diameter 50 mm -6m,

Sewage line К2: diameter 400 mm, 500 mm – 1220m

Sewage line К2Н: diameter 90 mm, 160 mm – 675m

Sewage line К1Н: diameter 63 mm – 190m

Sewage line К1: diameter 200 mm – 25m